Page 148 - Annual Report_21-22
P. 148
33 Quality assessment for referee samples of Indian Power Coal Coal India Limited, Kolkata
(through CIL subsidiaries &
Nodal CSIR Lab CSIR-CIMFR,
Dhanbad
34 Optimization of process for the treatment of Spent Pot Lining M/s NALCO, Bhubaneswar
carbon for the recovery of valuables and bench scale testing
35 Feasibility of bauxite leaching under high temperature M/s HINDALCO, Belagavi,
conditions Chhattisgarh
36 Preparation of iron ore pellet and pot grate study M/s. Jindal Steel & Power Ltd,
Angul (JSPL)
37 Pelletization study of iron ore fines M/s Vedanta Limited, Sesa , Goa
38 Characterization and Beneficiation of Low-grade Bauxite Ores M/s Geological Survey of India,
from Gujrat Nagpur
39 Beneficiation of Silica Sand for Solar wafer Applications M/s Geological Survey of India,
Nagpur
40 Studies on the Characterisation and Beneficiation of Tensa Iron M/s Jindal steel & Power Ltd,
Ore Fines to develop an Iron Ore process flowsheet Angul, Odisha
41 Environmental Pollution Monitoring in and around Paradip Port M/s Paradip Port Trust, Odisha
42 Characterization and beneficiation of Iron Values from Lean- M/s Thriveni Earthmovers Pvt.
grade BHJ Ore Ltd , Odisha
43 Rheological testing of Fly ash samples for pipelines Sasan, (Reliance Power),
transportation at Reliance Power project, Singrauli, M.P Mumbai, Maharashtra
44 Development of innovative and robust process of antimicrobial KIIT Bhubaneswar, (Work Order
coating on Aluminium substrate from NALCO)
45 Mineralogical characterization of Iron ore sample M/s Euro Pratik Ispat Pvt. Ltd,
(EPIPL), Jabalpur, Madhya
Pradesh
46 Studies on improvement of lime content of the Alkali Bypass M/s. Ultra Tech Cement Ltd,
Dust Unit: Sewagram Cement Works,
Gujrat
47 Pilot Scale Test Work for Beneficiation of Iron Ore Fines samples M/s. BSBK Pvt. Ltd., Bhilai,
from Dalli Mines of Bhilai Steel Plant Chhattisgarh
48 Sintering of iron ore using Sinter Aid of M/s Innocule: An M/s. Innocule, Bhubaneswar
optimization study
49 Preparation of basic engineering package (BEP) for setting up NALCO, Bhubaneswar
of pilot/demonstration plant of fly/pond ash for production of
wear resistant ceramic tiles.
CONSULTANCY PROJECTS
Sl. No. Project Title Sponsor
1 Certfication work on Minerals and Metallurgical based M/s. MSP Sponge Iron Ltd,
Industries as a third party Environmental Auditors Keonjhar, Odisha
2 Studies on facilities of existing Iron Ore Pellet plant to enhance M/s. Godawari Power and Ispat
the capacity from 2.4 MTPA to 2.6 MTPA based on provided Ltd Raipur, Chhattisgarh
data by M/s GPIL for No increase of Specific Environmental
Load as a third party Environmental Auditor
3 Training Program on Mineral Characterization, Beneficiation M/s.Directorate of Mines, Govt
and Analysis of Odisha, Bhubaneswar
4 Technical Support and customized design of Expert Eye-on- M/s. SVNT INFOTECH PVT. Ltd,
pellet System against purchase order received from Pellet Telengana
Plant-2, JSW Steel Pvt. Ltd., Bellary, Karnataka
146 ANNUAL REPORT 2021-22